Mill Lane Footbridge Photographs

Opening of new Mill Lane FootbridgeOpening of new Mill Lane Footbridge on 22 July 2008.

                   

                       

                        

A 220 tonne crane was positioned alongside Crowthorne Road to remove the north span of the existing footbridgeA 220 tonne crane was positioned alongside Crowthorne Road to remove the north span of the existing footbridge

                    

                      

                       

The span was removed from site for crushing and recycling by the demolition contractorThe span was removed from site for crushing and recycling by the demolition contractor.

                    

                      

                       

Steel reinforcement in place for the main base archSteel reinforcement inplace for the main base arch.

                    

                      

                       

Using a hopper to place concrete to a column plinthUsing a hopper to place concrete to a column plinth.

                    

                      

                       

Preparing to start piling at Mill LanePreparing to start piling at Mill Lane.

                    

                      

                       

                

Placement of steel reinforcement into concrete piles at Mill LanePlacement of steel reinforcement into concrete piles at Mill Lane.

                    

                      

                       

              

Piling rig install a test pile at Mill Lane

                

                      

         

Piling rig installing a test pile at Mill Lane site.


-Listen to this page- -Listen- -Feedback on this page- -Feedback- -Print this page- Print


top

Skip to main content
[
Home
]
[
What's New
]
[
Sitemap
]
[
Search
]
[
Frequently Asked Questions
]
[
Website Help
]
[
Complaints Procedure
]
[
Disclaimer
]
[
Feedback Form
]
[
Accessibility
]
[
Skip to main content
]